Forum: Carrara


Subject: Millenium Falcon, Day One

Kixum opened this issue on Sep 03, 2004 ยท 12 posts


Kixum posted Sat, 04 September 2004 at 10:38 AM

1.) How long to build? A.) I spent about an hour on this. It's really important to have a very precise scale mockup when you start. That way you can add new detailed pieces and you know they'll fit into the final product perfect. There are still a few things about this mockup which aren't perfect and I'll be tweaking it a little before I head into the detailed major pieces. The process will be to build detailed large scale components (the ones already shown), add detailed small components, then surface, then paint job. 2.) What modelers? A.) All spline in Carrara except for the main body. That was originally a spline object which was converted to vertex and the edge pieces cut out of it. -Kix

-Kix