When you create a walk path in the Poser interface it loads bent and with 6 nodes, 4 nodes for the path as walked, plus the two "tweaker" nodes at the ends. Some times you might want to start with a straight path with less nodes. So attached above is the text for a straight path with 4 nodes, 2 end nodes for the path as walked plus the two "tweakers".