beonalert opened this issue on Apr 12, 2006 · 6 posts
elzoejam posted Thu, 13 April 2006 at 7:25 AM
You need to apply V3 MATS to Eszter in the material room. If you need help. IM me and I'll walk you through it. You are doing the dial correctly :-)