Forum: MarketPlace Showcase


Subject: Sikorsky WW I Bomber WIP

Michael_C opened this issue on Aug 30, 2023 ยท 18 posts


Michael_C posted Sat, 23 September 2023 at 10:08 AM

Here's the partially reworked cabin.  The bomb rack, several of which could be carried, was lifted to a set of rails on the cabin wall.  The bomb bay cover was removed and a crewman, instructed by the bombardier who was looking through a rudimentary sight in the floor on the other side of the cabin, pushed the rack over the bomb bay opening.  A mechanism in the rack automatically released the bombs.  When the rack was empty it would be replaced with another.


My Store - My Gallery - My Freebies - My Web Site