Evanara opened this issue on May 24, 2003 ยท 7 posts
Evanara posted Sat, 24 May 2003 at 8:46 AM
The inside frame is done, now to work on the covering.
The full package will include a cart and a dismantled version of the yurt (to put on the cart).
Anyone interested in this ?
Evanara