FishNose opened this issue on Jan 28, 2004 ยท 17 posts
FishNose posted Wed, 28 January 2004 at 3:30 AM
I work with a figure, add morphs to it and so on, then save the cr2 or crz. Sometimes P5 creates an obj of that figure - in the same folder as the cr2. Without me asking for it. Ths is EXTREMELY irritating, since if I move the cr2 elsewhere or change the name of the folder etc, suddenly I can't load the cr2 next time without complaints. Why does P5 do this? P4 certainly never did. :] Fish