Evanara opened this issue on Aug 15, 2005 ยท 7 posts
Evanara posted Mon, 15 August 2005 at 5:31 AM
3 items (Side, Center and separation wall with sliding doors), cameras and lights plus a full floor set (made with the main parts).
The set is being tested and should appear sometime early september, if all goes well.