Forum: Poser - OFFICIAL


Subject: WIP changes to my grab-dredger-sub

Anthony Appleyard opened this issue on Mar 24, 2007 · 4 posts


Anthony Appleyard posted Sat, 24 March 2007 at 12:38 PM

Its underbelly dredgings tank is about 50% longer.

I have tidied the geometry among the join between the main part of the hull and the side flotation tanks.

(The round bulge behind the dredgings tank is a centrifugal suction pump.)

Not uploaded yet.

But still, don't scuba dive near it.

(To see imageful size, right click on it and follow instructions.)


Mogwa posted Sat, 24 March 2007 at 1:22 PM

As always, great work, Anthony.


Anthony Appleyard posted Sat, 24 March 2007 at 5:41 PM

www.kuroyumes-developmentzone.com/appleyard/3d/grabdredgersub.zip
www.kuroyumes-developmentzone.com/appleyard/3d/grabdredgersub_legs.zip
I have now updated my grab-dredgersub and its  land legs for the longer hold as described above.


xantor posted Sun, 25 March 2007 at 10:08 PM

Thank you.