Mon, Oct 21, 2:46 AM CDT

ABIS - POGO

Poser Science/Medical posted on Dec 16, 2010
Open full image in new tab Zoom on image
Close

Hover over top left image to zoom.
Click anywhere to exit.


Members remain the original copyright holder in all their materials here at Renderosity. Use of any of their material inconsistent with the terms and conditions set forth is prohibited and is considered an infringement of the copyrights of the respective holders unless specially stated otherwise.

Description


Within seconds of Hercules clearing the launch tower the technicians monitoring the booster�s progress as it heads toward space know that something is going very badly wrong with the flight as their instruments start to register POGO - extreme, intense and violent vibrations along the entire length of the Super Boosters airframe. Already the aptly named �POGO Meter� on the technician�s main console is registering that the airframe is under pressure to the extent of plus or minus 10 gees with the meter slowly climbing every second. They immediately make the Flight Director aware of what is happening to the huge super booster. Present in Mission Control is Robert Carter who has come to see this latest flight of the Hercules and its first time ML Test Article payload. Whilst Carter�s and all other eyes in Mission Control have only being paying scant attention to anything which is not in their particular sphere of observation, they are all now casting near continuous glances toward the technicians in the booster control section waiting to hear what will happen next. Plus or minus 15 gees � and the meter still keeps steadily rising. In the booster control section in Mission Control the technicians are constantly monitoring the telemetry from the Hercules trying desperately to find the answer to what is going so badly wrong with the flight. 20 � and still the meter keep steadily rising. From his vantage point next to the Flight Director in Mission Control at Kennedy Space Centre Robert Carter also has his eyes now firmly fixed on the booster control section. He knows that that should the POGO meter reach 51 the Flight Director will have no option but to terminate the flight by initiating �self destruct� of the booster and its payload. 30 � and still the meter rises. Now well on its way toward low Earth orbit the Hercules Super Booster and its ML Test Article payload are out of range of the ground based telemetry tracking cameras allowing the technicians in the booster control section only their various tracking instruments to determine the cause of the problem and find a means to correct it before it is too late. Everything they try is to no avail as still the meter continues its steady rise. 35 � and it looks as if the problem may be correcting. But the brief, instant, moment of relief felt as the POGO meter seemed to slow or even be on the verge of stopping its inexhaustible rise toward 51 is as quickly cast aside as the meter jumps to 40. In Mission Control both the Flight Director and Robert Carter know what must come next. Normally the responsibility would lay with the Flight Director to take the next necessary steps to end the flight but as he reaches into his pocket and extracts the red tagged key which will unlock the clear plastic panel which covers the boosters self destruct button Carter reaches across and takes the key from his Flight Directors hand and unlocks the panel himself allowing the panel to slide back. Like some red Cyclopsian eye the self destruct button seems to stare out at Robert Carter. He knows that one gentle push of this button will send out a signal which will instantly destroy not only the multi-million dollar Hercules Super Booster but also its multi-million dollar test article payload. 45 � and Carter�s finger hovers over the fateful button. 50 � and Carter pushes his finger forward as the meter reaches 51.

Comments (5)


)

ledwolorz

3:33AM | Thu, 16 December 2010

Fantastic sci-fi work.

)

aztek

4:00AM | Thu, 16 December 2010

Oh, wow! This has me breathless! Don't let him push the button, do something!!!

)

neiwil

7:40AM | Thu, 16 December 2010

Gripping stuff, your nail biting narrative is excellent.Add to this the excellent render and it's bloody marvelous stuff.

)

crender

9:53AM | Thu, 16 December 2010

Simply superb!!!!!!!!!!!!!!

)

SIGMAWORLD

9:00AM | Tue, 28 December 2010

Interessante tory und klasse Bild!


0 92 0

01
Days
:
21
Hrs
:
13
Mins
:
31
Secs
Premier Release Product
Winter Cabin for DAZ
3D Models
Top-Selling Vendor Sale Item
$22.00 USD 50% Off
$11.00 USD

Privacy Notice

This site uses cookies to deliver the best experience. Our own cookies make user accounts and other features possible. Third-party cookies are used to display relevant ads and to analyze how Renderosity is used. By using our site, you acknowledge that you have read and understood our Terms of Service, including our Cookie Policy and our Privacy Policy.