Almost finished by T.Rex
Open full image in new tab Members remain the original copyright holder in all their materials here at Renderosity. Use of any of their material inconsistent with the terms and conditions set forth is prohibited and is considered an infringement of the copyrights of the respective holders unless specially stated otherwise.
Description
Thursday, June 22, 2017
This is the same camera angle as in a previous post of this. The welded areas have been covered with some black synthetic sheathing material. Then an insulating material has been injected. This can easily be seen on the two pipes behind the orange pipe. The sleeves here are bulging outwards from the injected insulation material. Note no pipe is exposed - all is covered by sheathing. Thus, no rusting and no leakage of heat from the pipes.
On July 4th my building will have no heat or hot water since the system is being tested.
Enjoy!
Comments (4)
Faemike55
great shot and information! a day or two without and then possibly endless source - I could live with that...
Richardphotos
very interesting but glad I am not working there in a ditch. great captures
Krittermom
Hopefully the end result will be worth the mess!
RodS
Sounds like a very well thought out and effective system. Cool photos!